We are documentingour first project.Including what is still open.
Green Ampere is young. We could claim references — instead we show one, in full: the starting condition, the decisions, the current status, the open points.
Project number
001
Location
Vienna, Austria
Property
Residential property, several levels, extensive grounds
Size
around 400 m²
In progressPhotovoltaicsBattery storageEV charging infrastructureSmart building
The exact address of the property is not published, out of respect for the owners' privacy.
A well-appointed existing property whose technology has grown over the years: strong individual systems with no shared layer between them. The project brings them together into one coherent system and makes it visible through Aurora OS.
Image to followExterior view at blue hour, building clearly recognizable — publication only with the owners' approval
Starting point
Plenty of technology. Little connection.
The property was well equipped. Every piece of that equipment had simply been planned on its own.
Scope of work
Survey of all systems and interfaces
System architecture and control logic
Network and segmentation — implemented
Integration of photovoltaics, storage, heat pump and EV charging infrastructure
Sensors, security, indoor climate, pool
Aurora OS as the shared interface
Coordination of the trade partners
01
Generation, storage, heat and charging each work on their own. Surplus is fed into the grid, while other loads draw from the grid later.
02
Pool, security, shading, lighting and climate each have their own way of being operated — every one of them works, none of them knows about the others.
03
The state of the building cannot be read in full anywhere. To find out what is happening right now, you have to look in several places.
04
The network and the sensors were never laid out for trades to talk to each other continuously and securely.
Systems
What is being brought in.
Every system carries the state it is actually in. Nothing is marked “implemented” until it is.
Implemented
Network & segmentation
A solid foundation, with building services kept separate from everyday use.
In progress
Sensors
Temperature, humidity, state and presence recorded for each area.
In progress
Photovoltaics
Existing generation is brought into the shared control logic.
In progress
Storage
Charging and discharging rules follow what the house actually needs.
In progress
Heat pump
Operation is tied to generation and to who is at home.
In progress
Hot water
Heated in surplus hours wherever possible.
Planned
Buffer tank
Thermal storage for surplus energy.
In progress
EV charging infrastructure
Charging follows surplus and the planned departure time.
In progress
Pool & water systems
Temperature, circulation and water readings become visible — and can be shifted to the right hours.
Planned
Shading
Controlled by sun position, indoor temperature and presence.
Planned
Lighting
Light scenes, and switching off when nobody is there.
In progress
Security
Alarm, door and window states in a single overview.
Planned
Access
Permissions for residents, guests and trade partners.
In progress
Indoor climate
Temperature and humidity per zone, instead of one setting for the whole house.
In progress
Terrarium monitoring
Temperature and humidity monitored, with an alert when values drift.
In progress
Energy management
The order in which surplus is used is defined and active.
In progress
Aurora OS
All states brought together in one view. The scope grows as more trades come online.
Progress
The path to a system.
01
Taking stock
Implemented
A complete survey: which systems are in place, which interfaces they have, and which of those can actually be used. The result was one list of systems that can be controlled — and one of systems that cannot.
02
System architecture
Implemented
Defining which layer makes which decision, which channels the systems use to talk to each other, and what happens when a component fails. This phase is the foundation for everything that follows.
03
Network and sensors
Implemented
Building the technical foundation: separate network segments for building services, secured communication, sensors wherever a decision needs data.
04
Integrating the trades
In progress
Connected step by step: generation, storage, heat, charging, pool, climate, security. Each trade is commissioned and checked on its own before the next one follows.
05
Control logic and automation
In progress
The order in which energy is used, the response to an open window, what the house does when nobody is home: rules are defined, watched and tightened.
06
Operation and refinement
Planned
Ongoing evaluation over a period long enough to mean something, so the rules can be matched to how the building is actually used.
Images from the project
Image to followMechanical room: storage, distribution, network
Image to followAurora OS in operation with real data from the property
Key figures
Numbers only after measurement.
There are no reliable before/after values for this project yet. Once measurements have been taken over a meaningful period, they will appear here — with the measurement period and the method. Until then, nothing appears here.
Findings
What we learned along the way.
Documented because it makes the next plan better — not because it reads well.
01
Taking stock is the most important step, and the most underestimated. Anything that cannot be controlled does not exist as far as an intelligent building is concerned — however good the equipment is.
02
Network and sensors first. Automation on a weak foundation produces faults that nobody can trace back to a device.
03
Commission one trade at a time. Connect several at once and, when something goes wrong, you can no longer say where it came from.
04
Automation that people do not understand gets switched off. Every rule needs a reason the system can show — otherwise it does not survive everyday life.
05
An existing building is not a new build. Some perfectly sensible rule will fail because of a component bought years ago without an interface. That belongs in the planning, not in the excuses.
Open
What is still missing here.
These sections are prepared. They stay empty until there is approved material.
Photo documentation, before / after
Prepared. Nothing is published until the owners have approved it, and until we have images that match the brand's visual direction.
System architecture as a diagram
It exists as a planning document. A version that can be shown publicly, without the details that need protecting, is in preparation.
Video: automation in operation
Planned, once the control logic has run stably over a longer period.
Aurora OS screens from this project
These follow once the interface covers the full scope of the property. Until then, this website shows nothing but demo data, marked as demo data.
Energy figures, before / after
Only after a measurement period long enough to support a statement. Numbers without a measurement period and a method are not metrics.
The next project — same structure.
We document every project the way we document this one: starting point, decisions, status, open items.